Sea gulf installation instructions


















For more detailed support, you are always free to contact us with any questions! Be sure to research any local permits, special codes or regulations that you may need to follow or apply for.

This is a crucial step for any commercial or residential project. Whether or not you need permits or have regulations to follow varies based on location. Each state, county or even lake can be different. A good start is the Wikipedia page on Environmental Agencies by State , but let us know if you need any help! Seawalls can vary greatly in cost depending on what materials are used. The type of materials selected typically takes into account the demands of the environment. A small canal or golf lake can make use of lighter, shorter products, whereas oceanfront requires stronger, more deeply-driven sheets.

The easiest way to scope out your project needs also happens to be free! You can talk to one of our experienced seawall engineers who can produce a free estimate. A drive guide is a horizontal typically wood structure to set up to help keep your sheets in alignment with each other during the sheet driving process.

Assembling a drive guide before you begin installation of a seawall provides you with a precise wall position during installation.

The drive guide is crucial to ensure a straight and firmly placed wall. Drive guides are essential; do not attempt to drive sheets along just a string line. The first step to setting up your drive guide is to install temporary posts. Run a string line where the wall will stand for proper pole placement. Again, please note that the string line is used for pole placement to set up a drive guide, NOT for the wall itself. The drive guide should have an approximate size of four to six feet by six feet, and can become a piece of the permanent structure for a wood capped wall.

Position your drive guide to the temporary posts by tack nailing it, screwing it or securing it with c clamps. This speeds up install time and helps your sheets stay in alignment during the driving process. Before driving, be sure each pair of sheets is lined up horizontally and vertically. It is critical that you get the first pair of sheets you install straight and plumb, so the rest of the wall can follow suit. If you encounter tough soils you do have the flexibility of going from one single sheet to the next.

We recommend starting with the male piece so that soil and debris can escape via the female. After reaching your desired embedment point, place a lag screw in the flange on your leading sheet of the pair.

Se vier 1 Light Outdoor W all. Si vous a vez besoin de. T o register y our fixture, please visit our w ebsite:. These fixtures ar e intended to be installed utilizing compliant junction NEC. This product is saf ety listed for w et locations. Incandescent version ma y be dimmed with a standard incandescent dimmer. Consult lamp manufacturer. This pr oduct r equir es installation b y a qualified electrician.

Bef or e installing be sur e to r ead all instructions and. Este productor debe ser instalado segun el codig o de instalacion. This product m ust be installed in accordance with the applicable. Sea Gull Lighting fixtures and components, when properly installed and under normal conditions of use, are warranted to be fr ee from def ects in materials and. Sea Gull Lighting at its sole option will repair or r eplace , F.



0コメント

  • 1000 / 1000